On CSX Trenton Line, inching by parked wells on the Skillman Siding. Load: Heat Exchanger (to Democratic Republic of Iraq). Per the Air Products crew, the heat exchanger was supposedly 965,000lbs at 15'9". The locomotive eventually cut away to move some of the parked equipment because of clearance issues. 0930 hours. |