The conductor sets the coupler before approaching the switch that needs to be aligned. |
Date:
11/11/2011 |
Location:
East Chicago, IN Map ![Show East Chicago on a rail map](/images/map_us.gif) |
Views:
287 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Gary Everhart |
Locomotives: |
Author: Gary Everhart
|
![NS 4641](http://s3.amazonaws.com/rrpa_photos/74832/1cNS%20GP59%204641%20d%20conductor%20coupler.jpg) |
Picture Categories: Roster,RollingStock,Track,Action |
This picture is part of album: Gondola Pick Up at the Steel Mill |