MOW track equipment unloads         
The massive unloading of track equipment continues along Roosevelt Highway in Fairburn, GA on October 15, 2015.
Date: 10/19/2015 Location: Fairburn, GA   Map Show Fairburn on a rail map Views: 68 Collection Of:   Alan Page
Author:  Alan Page
MOW track equipment unloads
Picture Categories: Action This picture is part of album:  Mainline trackwork in Union City to Fairburn, GA
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4326893