When I took this in 1978, just two years after Conrail startup, anything painted full CR was still something of a novelty, as there was an awful lot of equipment that was in patch paint. This fully painted CR 60 foot box was on the LIRR RF 7 job rolling on the bypass track to the south of track 8 at Jamaica station, headed for Holban. |