The 1: 11 PM eastbound Train Crosses over from Track 1 to Track 2  Contributor's Pick!       
The 1:11 PM eastbound is seen crossing over from Track 1 to Track 2. NJT 6061 Cab Car is leading here. 70-300mm zoom lens used.
Date: 8/23/2022 Location: Summit, NJ   Map Show Summit on a rail map Views: 132 Collection Of:   Steve Coraggio
Rolling Stock: NJT 6061 (Cab Car) Author:  Steve Coraggio
The 1: 11 PM eastbound Train Crosses over from Track 1 to Track 2
Picture Categories: RollingStock,Station,Track,Action This picture is part of album:  The 1:11 PM eastbound Train Crosses Over from Track 1 to Track 2
Share
User Comments
Name Type Comments Date
Tom Beckett General Love the way the zoom brings in the train, as well as draws attention to all the hardware-signals and catenary-that make this line unique. 10/27/2022 4:30:41 AM
Steve Coraggio General THANK YOU TOM!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! 10/27/2022 8:56:19 AM
Tim Darnell General Nice approaching shot!! 10/27/2022 10:50:40 AM
Steve Coraggio General THANK YOU VERY MUCH, TIM!!!!!!!!!!!!!!!!!! 10/27/2022 5:09:18 PM
Scott Crotwell General An excellent shot and scene! 10/27/2022 9:35:20 PM
Steve Coraggio General Scott, thank you very much!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! I like catching cross over shots. 10/28/2022 10:59:38 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5859334